Thursday, March 8, 2007

Kitchen 101: Part 3

Once the floor was finished, we were ready for the granite.   We ordered the granite back in November, but it took FOREVER for it to get here.  It was shipped from China, had a lay-over in Houston, and sat at the Solaire job site http://orlando.yourcondoco.com/developments/details.cfm?devId=98 for a month.  Mark would get the guy on the phone, and he would say, "blah, blah, blah, it's going to be another week.  Well, the granite finally made it here.  We had their guys come out and install it, and the under mount sink.  Once that was done, Mark was able to do the plumbing for the faucet, disposer, and dishwasher.  Finally...we had more than one sink in the house again!  Next, we hooked up the rest of the power and could start using the kitchen again!



Cimg4044



Cimg4051



Cimg4052



We got really excited when the granite went in.  It felt like we were getting close to the end, so we went shopping for the pendant lights to break the monotony of working in the kitchen.  It was kind of hard to find some that were simple, fairly small, and that didn't cost $200 each...but we did.  Things were starting to look much better, but we really had a lot of work left to do.



  It was time to face the drywall once and for all.......we had to finish up what Charles and Duane couldn't get done between cigarette breaks.  We started with the ceiling, ugh!  After three layers of mud and a house full of dust we got a pretty smooth ceiling.  Once that was done, we primed the walls and ceiling with Kilz.  Man that stuff is incredibly thick.  I think I broke down and cried at least 3 times while trying to get it on the ceiling.  That was a horrible job.  While I was doing that, Mark put the trim around the cabinets, put down the base boards, and the casing around the windows and pass-through.  After all of the trim was done, I started painting it all.  While I was doing that, Mark started tiling the back splash.  The back splash tiles are the same color range as the floor tiles, only smaller.



Cimg4091Cimg4094 Cimg4101



We took some time off for the work week and the next weekend Mark grouted the back splash while I painted the walls. 



Cimg4156 Cimg4158 Cimg4172



  We still have to put the hardware on most of the cabinets and drawers, finish all the outlet/switch covers, and some put a few trim pieces on the cabinets and we'll be done.......with the kitchen.



Cimg4110 Cimg4111 Cimg4120_1 Cimg4121 Cimg4122 Cimg4123



To be completely done with the work on the inside of our house, we have to finish the drywall craters that Charles and Duane left us in the dining room, move an outlet that is in the middle of the wall down to the floor, put up crown molding, paint the crown molding and the base boards, and paint the ceiling and the walls................that's it you say?  Doesn't sound to bad to us especially after what we just went through in the kitchen.  We'll post some pictures of the rest of the monstrosity soon.  Hopefully, we can just show the finished product.  This remodeling stuff is really starting to get old, but we love what we've done so far.         



Thursday, February 22, 2007

Kitchen 101: Part 2

To continue...the wePicture_139_4ek before Christmas, the drywallers came.  The boards went up pretty fast, andPicture_166_1 the mess began.  Originally, Charles told us that the job would only take 2 days to complete...with walls that would be "as smooth as glass" and "ready to paint".  That sounded really fast to me, after seeing what it took Mark to get the wall perfect in the bedroom.  But, we believed that since they were professionals and they used "hot mud", that they must be able to work faster.  The first day I came home, the guys were still here working.  By 5:15, they were  out of here, but there was no mud on the walls, just the boards were hung.  At that point, we realized that this really was going to take several days.  In three days they were, what they Picture_284_1called, finished.  We called them to tell them that they completely forPicture_050got to mud certain areas (the screws were still exposed), and many of the places that were "finished"  were not smooth at all.  So, Charles came back out. But, when I got home that day, I could see that the walls still were not smooth.  Mark gave him a call the next day,  and he sounded surprised that we were calling.  He seriously  thought he was done.  Mark circled all of the spots we weren't satisfied with (which was practically every place a screw went in the wall, and had him come out one more time.  It's no big surprise that even after this last time, the walls were not smooth.  They would have to be re mudded and sanded multiple times after that (by Mark).  After we got those guys out of our house, Mark and his dad started installing the newPicture_343_2 Picture_346_1cabinets.  This was so nice, because it finally gave us a little more room to breathe in the rest of the house.  Until then, cabinets were all over the house, anywhere we could find a place for them.  Mark also started building the island.   Now, we could finally see the kitchen start to take shape!  The next major task we took on was tiling the floor.  It actually took us two weekends to complete.To start, Mark poured out this leveling mixture because the floor was sloping downward on the wall where the stove and fridge were going to go.  This stuff was so cool!  It started setting almost immediately, and with in a couple of hours, we had a perfectly level floor!  Next, we started mixing the mortar, which turned out to be one of the hardest parts of the whole job.  And, once you've got that stuff mixed, you can't quit until you're through with the bucket!  Laying the tile wasn't so bad, except that it killed Mark's knees (even with knee pads). What slowed us down the most was cutting all al the tiles that had to go around the corners  and  walls.  On Picture_356the second weekend, as we were Picture_352just about to be done...we realized that we were going to be 2 tiles short....ha!  We can laugh about it now, but after working for about 12 hours straight, this was just about enough to push Mark over the edge!  He ended up going up to the warehouse one day in the following week to pick up an extra box to finish the job, and to have a little extra.  Once we had it all layed down, we had to go around  the room, and scrape out the morter lines, so the grout would adhere to the tiles, and create clean, straight lines.  Once that was done, Mark was able to lay the grout pretty quickly, and then he was able to put the sealant on.  That's all for now.  We're muchPicture_378_2 Picture_371_3 further along than these posts show.  We should be completely finished by this weekend, then we can post the rest of the pictures.  Hopefully, I'll get them up on the site soon.   



         



   



Thursday, January 25, 2007

Kitchen 101: Part I

It's been a long time since we've posted anything, and it's because our computer crashed right before Christmas.  We were planning on getting a new one for Christmas anyway, but it was not cool to be left without one for almost a month.  We bought a new laptop last week, and all is well again!  We got a new Dell...a very cool little toy.  As a result, Mark and I have both been on it non-stop.  So, for those who haven't seen the kitchen pictures, we think it's about time to start showing you a little of the work we've been doing.  Unfortunately, we don't have many of the 'true' before Knotty_pine_cabnietspictures, because they weren't all backed up before the computer died.  To paint a picture for you, we had these 60's style knotted pine cabinets that were old and looked extremely dark and grimey.  This is kind of what they looked like, but ours were much worse.  These appliances are lightyears ahead of the ones we had, including the dishwasher that didn't exist in our kitchen. 



So, it all started the week of Thanksgiving.  Mark took a week off work, and his dad came over to help demo the kitchen (thanks Pops!!).  We rented a big dumpster that sat in the driveway for two days.  They started by tearing out all of the cabinets.  Then, they took down all the drywall.  We originally intended to keep the ceiling, because that seemed like it would be a huge pain to put up ourselves.  With one last piece of drywall left, a strong tug of the wallboard caused the ceiling board to rip.  At that point, Mark and his Dad decided to take the whole ceiling off.  Mark had to call me at work that day to warn me that everything in the kitchen had been ripped down to the studs.  He thought I might have a panic attack if he didn't.  It turned out to be a good thing in the end though, because it allowed us to install recessed lighting, which would have otherwise been very dificult.  Picture_100_2 Another task Mark decided to take on himself was all of the electrical work.  I think at first, he was just going to do some of the work, so it would cost us less.  But by the end, he had read up on it so much, and spent so much on materials, that he just decided to do it all himself.  Here's a picture of us in the crawlspace/basement hooking up the power for the lights.  Another task that was harder than it looked was tearing off this old siding from one of the walls in the kitchen.  The kitchen and the bedroom was an addition on this house.  That might explain the water damage in the wall in the bedroom.  When they added on, they just put drywall over the existing exterior siding.  Mark had to pry all of those boards off. It was especially difficult in the corner, where the boards ran past the wall and into the bedroom.  It's kind of hard to explain, but here's a picture.



Once the demo-dust was cleaned up we started on the floors.  The first thing Mark did was reinforce the floor joists from the basement.  It really made the floor more stable since we were planning on tiling.  Mark and his dad got up as much linoleum as they could, then they used twelve tubes of liquid nails and 500 screws to put plywood down.  Once the plywood was down we laid hardi backer board down on a bed of mortar with another 500 screws.  That's a lot of screws...........



So, the next brilliant idea we had was to tear down yet another wall!  It would allow us to cut an opening from the kitchen into the dining room.  That turned out to be one of the best decisions we've made.  We can't wait to see this all finished, because it's going to really open up the two rooms.  Here's a picture of Mark tearing in to that wall.  Here's me, freezing in flannel because we have to keep the doors open when all this dust is flying around.  Then, here's a picture of Mark, framing the opening.



      Picture_082Picture_084



      Picture_087Picture_094_1   



Since the drywalling was now going to include the ceiling too, we decided to hire that out.  We knew we could do that ourselves, and we knew we could do a good job, but it takes a long time, and wPicture_111e Picture_125just wanted a professional to come in and take care of it for us so we could move on to other things.  Before the drywallers could start, we had to get the insulation up on the outside walls and the ceiling.  Expecting the drywall guy on a Wednesday we cut it close and started on Tuesday night.  We ended up working on it until midnight for me and 2:00 am for Mark (I had to get up at 5:00 the next day).  Good thing we stayed up so late, because the drywallers didn't make it out until Friday......This was a sign of things to come with Charles and Duane.  This story is turning out a lot longer than I thought it would!  There's a lot more to show you, but we're going to have to split it up into multiple posts. End Part I                            



Picture_116      Picture_117



   



Wednesday, November 29, 2006

We don't want to scare you...

but we wanted to show you some before and after pictures of some of the "projects" we've been working on since this past April.  If you asked us to come visit or go do something fun this summer, we probably said no, and this is why.  The reason we were getting new siding and windows back on our first post was because we discovered that a wall in our bedroom had water damage.  Water got in the wall and rotted the studs. You could push on the wall, and the whole thing would move...very scary.  We decided to take the wall off, replace the studs, get new siding (which included new windows), and fix the roof so no more water would get in.  Sounds easy, right?   It wasn't...just ask Mark.  Mark's dad helped out with replacing the studs (which was a HUGE job, and we're so glad he was here that day).  Other than that, he was pretty much on his own. 



Here's what it looked like before.



Orange_wall_1 Orange_wall2 No_wall



And here are some once it was finished.  We're putting Kilz primer on the walls. 



Mark_working Jo_working2



In case you're wondering...drywalling is one of the worst jobs on earth.  We can't believe some people do this for a living.  If you see specs all over these pictures, it's the drywall dust that's been flying all over our house for the last many months.  Here is a picture that shows just how thrilled I am to be working on this on a Monday night.



Jo_working_1



Fixing the wall wasn't enough for us.  We decided we had to do something about the washer and dryer that was brilliantly designed to go in the kitchen.  In order to get those out (and make way for a dishwasher once we remodeled the kitchen), we had to divide the big closet we had in the master bedroom into two closets...one for our clothes, and one for a stackable washer/dryer.  Here's what the closet looked like before.  It was pretty long, and we just had one bar that ran across to hold clothes.



Old_closet   



Here's the big divide of the closet into two...before drywall, and after.



Two_closets Two_closets_with_drywall



Mark tiled the floor in the laundry closet, and he ran the plumbing and electrical work himself!  Also, here's a picture of the inside of the new "double-decker" clothes closet.



Tile Closet_interior



Finally, here are some after pictures.  We had been staying in the guest room while all of this work was going on.  Now, we're back in our bedroom, and we are so happy!  The next project we're tackling is the kitchen.  The destruction has already begun...but you'll have to wait until we have some after pictures to show you once we're done.  We wouldn't want to depress you too badly, looking at just the before pictures.



Finished_wall Fan2



Two_new_closets Closed_doors